AC75 Class - Procedures for Compliance table:
PFC # | Date | Rule | Summary |
08 Jul 19 | 11.20 / 17.7 | Load tests | |
05 Jun 19 | 7.7(f) | Completing the LCA report | |
27 May 19 | 32 | Requesting an interpretation | |
31 Dec 18 | s.6 | Material compliance and Declaration. | |
31 Dec 18 | 22.12 / 22.10 | Specification of pressure relief valve(s) and requirements on location of the valves. | |
16 Nov 18 | 11.14 | Analytical calculations may be acceptable to show compliance. |