91 10 Feb 21 16.7 Rudder sensors and where they may contact the yacht
90 07 Feb 21 Interp 82 What is a strop
89 07 Feb 21 21.2, 21.3, 35.17 Mechanical components and control systems
88 07 Feb 21 12.11, 31.6, Interp 80 Aerodynamic fairing of the crew
87 06 Feb 21 1.3, 16.2, 16.6 Rudder draft change
86 09 Feb 21 22.7 Connection of hydraulic actuators to control surfaces
85 06 Feb 21 18.2 Bridging hollows in sail measurement
84 06 Feb 21 21.3, 22.7, 22.9, 22.13 Hydraulic actuators and mechanical connection to control surfaces
83 02 Feb 21 22.7, 35.55 Hydraulic actuators
82 04 Feb 21 20.1, 20.5 Strop
81 27 Jan 21 20.9 Use of shock cord in rigging
80 27 Jan 21 12.11 Interp 054 Aerodynamic fairings that cover the crew
79 25 Jan 21 20.6, 20.26, 35.17 Mainsail control systems
78 23 Jan 21 20.9 Adding tape to supplied rigging
77 19 Jan 21 20.10, 35.73, Rig/Sail-plan Fairing on mast for backstay
76 16 Jan 21 12.2, 35.99 Backstays and backstay strops
75 14 Jan 21 20.5, 20.6, 12.10 Positioning of backstays while racing
74 14 Jan 21 20.5, 20.6, 11.20, 17.7 Compliance with 20.5 and 20.6 whilst racing
73 08 Jan 21 12.11, 28.10 Covering of crew carried equipment
72 04 Jan 21 12.2, 20.1, 20.5, 20.6, 20.9, 20.19 Adjustment of running backstays and lowering mainsails
71 04 Jan 21 13.1, 13.2, 15.8, 15.9, 35.1 Foil flap connections to foil wings
70 30 Dec 20 28.2 Scheduling of crew weighing dates
69 12 Dec 20 23.1, 23.5, 26.2, 26.3, 35.10, 35.20, 35.109, 35.40, 35.87 Cameras and screens. Cameras looking at foils etc
68 04 Jan 20  
67 04 Dec 20 23.1, 23.5, 26.2, 26.3, 35.10, 35.20, 35.109 Cameras and screens. Cameras looking at foils etc
66 11 Dec 20 18.2 Hollows at sail girth points
65 30 Nov 20 11.16, 11.14, 11.8 Wet box drainage
64
 11 Dec 20 3.11, 10.1, 10.3, 35.108 Tolerances in rule 10.1
63 30 Nov 20 20.17 Continuous attachment of mainsail luff
62 18 Nov 20 22.8, 24.1, 24.2 ECC motors driving pumps on the HCC and such HCC system having accumulators and sensors
61 10 Nov 20 19.13, 35.15 Headsail sheeting
60 10 Nov 20 19.13, 35.15 Headsail sheeting
59 08 Nov 20 32.5 Interpretation process
58 10 Nov 20 19.10, 19.13 Use of headsail sheets and winches using tack or gybe
57 03 Nov 20 18.5, 35.64, 35.63, 35.66, 35.69, 20.13, 18.2, 5.11, 20.12, 19.14, 20.14 Hollows at sail girth points
56 21 Oct 20 20.17, 20.2 Mainsail attachment zones
55 02 Nov 20 21.2, 22.8, 24.1, 24.2, 35.24, 35.25, 35.26, 23.1, 35.109, 24.2 Current sensor in pump motors
54 26 Oct 20 12.11, 19.13 Loading and unloading headsail sheets from winch
53 21 Sep 20 19.5, 20.25 Hoist code zero on jib halyard. No need to measure with code zero halyard
52 26 Oct 20 18.1, 20.11, 20.29, 35.71, 35.98 Mainsail luff attachment devices
51 21 Sep 20 28.4, 28.5, 28.9, 35.8 Carried equipment being left on the yacht
50 24 Aug 20 19.13 Control of length of headsail sheet
49 05 Aug 20 19.1, 19.4, 19.10, 20.7, 20.9, 20.10 2:1 headsail halyard
48 22 Jul 20 22.2, 22.3, 22.4, 35.17, 35.43 Hydraulic systems on board that aren't used for control surfaces
47 05 Aug 20 31.12 Configurations as recorded on the certificate
46 02 May 20 6.1 Solenoids and hydraulic valves
45 16 May 20 23.2, 23.6, 24.4, 25.1, 27.7, 27.8 Power supplies for CIS, ILS and ECC
44 16 May 20  15.3, 15.4, 15.5, 35.94 Rotation of foil flaps
43 01 May 20 19.1, 19.3, 19.9, 19.14, 35.44, 35.46, 35.47, 35.71, 35.98 Fairings of luff cables
42 02 May 20 35.13, 35.104, 34.1, 6.1, 7.1,8.1, 8.2, 8.3, 8.4, 8.5, 8.6, 8.7 Commercial products, paints, core etc
41 16 Mar 20 17.1, 17.5, 35.6, 11.16 Bowsprits can be sealed but not bonded to hull
40 16 Mar 20 20.6, 20.11, 20.16, 20.17, 20.26, 20.23, 21.1, 21.4, 35.16, 35.97 Batten connection details in way of mast. Max 400mm.
39 19 Feb 20 5.1, 5.2, 27.1, 35.28 Modifying FCS
38 17 Feb 20 15.4, 21.4, 21.5, 35.15 Stored energy in control surfaces
37 22 Feb 20 13.2, 16.2 Splits in linear components
36 04 Feb 20 21.2, 21.9,  23.1, 24.1 Disabled accelerometer in ECC
35 04 Feb 20 8.7 Bobstay is not a controlled component
34 10 Feb 20 19.10, 19.15 Tacklines and code zero cunninghams
33 22 Feb 20 19.10, 19.11, 19.12, 19.13, 35.97 Clew block arrangement
32 07 Feb 20 22.5, 22.6 Pilot operated valves
31 04 Feb 20 21.3 Traveller rams and indexed control
30 28 Nov 19 20.23 Clarify language around batten connections
29 22 Nov 19 13.1, 16.1, 17.1, 17.5, 35.64 Linear components and fastening of linear components
28 28 Oct 19 15.7, 35.90, 35.36, 35.35 Foil flap chord lengths
27 25 Sep 19 11.8 Watertight bulkhead requirement
26 15 Sep 19 11.7, 11.19, 28.7, 28.8, 28.9, 28.10, 35.52 Cockpit soles and hull panel weight requirements
25 24 Sep 19 12.6, 13.1, 13.2, 13.8, 14.8 Foil arm drums
24 19 Aug 19 13.1, 15.2 Foil flaps, can be joined but need to have two
23 25 Sep 19 13.1, 13.2, 13.4, 15.3, 35.36, 35.93 Foil wing and rondure
22 25 Sep 19 22.5, 22.6 Pilot valves and actuators
21 16 Jun 19 8.5, 9.1 Base coat, Clear coat commercial products
20 16 Jun 19 8.5, 9.1 Awlgrip paint and commercial products
19 30 Jul 19 10.1, 10.13 Boxes / fairing on hulls
18 31 May 19 26.2, 26.3 Sensors in CIS devices
17 31 May 19 12.9, 21.2, 21.3 Indexed control of bullets in rams. Backstay examples.
16 31 May 19 12.9, 21.2, 21.3 Control of control surfaces. Mainsheet traveller example
15 07 Apr 19 21.2, 21.3 Clarification about non compliance outlined in Int 11
14 25 Feb 19 11.14 Retained water on deck, in rigging etc
13 07 Feb 19 10.1, 10.13, 19.16 Weight of headsail covers in 10.1
12 04 Feb 19 1.3 Cable penetrations and gaps Refers to Interp 8
11 14 Feb 19 21.2, 21.3 Hydraulic rams, locks and indexed control
10 03 Jan 19 1.1, 31.8, 31.11, 31.12, 34.1 Measurement certificates, authority and information
9 03 Jan 19 22.5, 22.6, 35.3 Hydraulic actuators, feedback and valves
8 11 Jan 19 5.1, 5.2, 5.3, 20.1, 20.2, 20.3, 35.77 Mast tubes, holes and openings
7 01 Dec 18 20.1, 20.5, 20.6 Dock tune and rig settings
6 22 Nov 18 7.2, 8.7, 35.103 Manufacturing requirements of uncontrolled components
5 19 Dec 18 12.11 Crew coverage and occasional covering
4 25 Oct 18 7.7 Timber mould or does it have to be a mould plug?
3 03 Jan 19 9.1, 11.19, 35.52, 35.53 Panel weight and paint finish, how it is measured
2 19 Oct 18 21.2, 21.3 Locks on a code zero halyard and indexed control
1 16 Oct 18 6.4, 6.8, 7.2, 11.18, 35.64 Linear components and voids closing

Ċ
Richard Slater,
2 Oct 2019, 18:17
Ċ
Richard Slater,
26 Sept 2019, 19:43
Ċ
Richard Slater,
26 Sept 2019, 19:43
Ċ
Richard Slater,
26 Sept 2019, 19:43
Ċ
Richard Slater,
26 Sept 2019, 19:43
Ċ
Richard Slater,
26 Sept 2019, 19:43
Ċ
Richard Slater,
26 Sept 2019, 19:43
Ċ
Richard Slater,
26 Sept 2019, 19:43
Ċ
Richard Slater,
26 Sept 2019, 19:44
Ċ
Richard Slater,
26 Sept 2019, 19:44
Ċ
Richard Slater,
26 Sept 2019, 19:44
Ċ
Richard Slater,
26 Sept 2019, 19:44
Ċ
Richard Slater,
26 Sept 2019, 19:44
Ċ
Richard Slater,
26 Sept 2019, 19:44
Ċ
Richard Slater,
26 Sept 2019, 19:44
Ċ
Richard Slater,
26 Sept 2019, 19:44
Ċ
Richard Slater,
26 Sept 2019, 19:44
Ċ
Richard Slater,
26 Sept 2019, 19:45
Ċ
Richard Slater,
26 Sept 2019, 19:45
Ċ
Richard Slater,
26 Sept 2019, 19:45
Ċ
Richard Slater,
26 Sept 2019, 19:45
Ċ
Richard Slater,
2 Oct 2019, 18:13
Ċ
Richard Slater,
2 Oct 2019, 18:13
Ċ
Richard Slater,
26 Sept 2019, 19:45
Ċ
Richard Slater,
2 Oct 2019, 18:13
Ċ
Richard Slater,
2 Oct 2019, 18:13
Ċ
Richard Slater,
2 Oct 2019, 18:13
Ċ
Richard Slater,
5 Nov 2019, 13:40
Ċ
Richard Slater,
10 Feb 2020, 23:35
Ċ
Richard Slater,
28 Nov 2019, 16:04
Ċ
Richard Slater,
10 Feb 2020, 23:35
Ċ
Richard Slater,
10 Feb 2020, 23:35
Ċ
Richard Slater,
22 Feb 2020, 15:07
Ċ
Richard Slater,
10 Feb 2020, 23:36
Ċ
Richard Slater,
10 Feb 2020, 23:36
Ċ
Richard Slater,
10 Feb 2020, 23:36
Ċ
Richard Slater,
22 Feb 2020, 15:07
Ċ
Richard Slater,
17 Feb 2020, 21:07
Ċ
Richard Slater,
23 Feb 2020, 20:42
Ċ
Richard Slater,
21 May 2020, 19:19
Ċ
Richard Slater,
21 May 2020, 19:19
Ċ
Richard Slater,
21 May 2020, 19:20
Ċ
Richard Slater,
21 May 2020, 19:20
Ċ
Richard Slater,
21 May 2020, 19:20
Ċ
Richard Slater,
21 May 2020, 19:20
Ċ
Richard Slater,
21 May 2020, 19:20
Ċ
Richard Slater,
9 Aug 2020, 18:24
Ċ
Richard Slater,
9 Aug 2020, 18:24
Ċ
Richard Slater,
9 Aug 2020, 18:24
Ċ
Richard Slater,
2 Nov 2020, 20:43
Ċ
Richard Slater,
2 Nov 2020, 20:43
Ċ
Richard Slater,
2 Nov 2020, 20:43
Ċ
Richard Slater,
2 Nov 2020, 20:43
Ċ
Richard Slater,
2 Nov 2020, 20:43
Ċ
Richard Slater,
2 Nov 2020, 20:43
Ċ
Richard Slater,
2 Nov 2020, 20:44
Ċ
Richard Slater,
3 Nov 2020, 12:46
Ċ
Richard Slater,
28 Dec 2020, 12:28
Ċ
Richard Slater,
9 Nov 2020, 14:01
Ċ
Richard Slater,
28 Dec 2020, 12:29
Ċ
Richard Slater,
28 Dec 2020, 12:29
Ċ
Richard Slater,
18 Nov 2020, 20:24
Ċ
Richard Slater,
27 Dec 2020, 12:40
Ċ
Richard Slater,
27 Dec 2020, 12:40
Ċ
Richard Slater,
27 Dec 2020, 12:41
Ċ
Richard Slater,
27 Dec 2020, 12:41
Ċ
Richard Slater,
27 Dec 2020, 12:41
Ċ
Richard Slater,
4 Jan 2021, 13:09
Ċ
Richard Slater,
27 Dec 2020, 12:41
Ċ
Richard Slater,
31 Dec 2020, 14:51
Ċ
Richard Slater,
4 Jan 2021, 13:24
Ċ
Richard Slater,
4 Jan 2021, 13:24
Ċ
Richard Slater,
11 Jan 2021, 16:56
Ċ
Richard Slater,
14 Jan 2021, 11:17
Ċ
Richard Slater,
14 Jan 2021, 11:17
Ċ
Richard Slater,
16 Jan 2021, 13:19
Ċ
Richard Slater,
19 Jan 2021, 11:41
Ċ
Richard Slater,
25 Jan 2021, 13:00
Ċ
Richard Slater,
25 Jan 2021, 13:00
Ċ
Richard Slater,
27 Jan 2021, 14:17
Ċ
Richard Slater,
27 Jan 2021, 14:18
Ċ
Richard Slater,
8 Feb 2021, 16:43
Ċ
Richard Slater,
3 Feb 2021, 12:32
Ċ
Richard Slater,
8 Feb 2021, 16:47
Ċ
Richard Slater,
8 Feb 2021, 16:47
Ċ
Richard Slater,
9 Feb 2021, 12:53
Ċ
Richard Slater,
8 Feb 2021, 16:47
Ċ
Richard Slater,
8 Feb 2021, 16:47
Ċ
Richard Slater,
8 Feb 2021, 16:47
Ċ
Richard Slater,
8 Feb 2021, 16:47
Ċ
Richard Slater,
11 Feb 2021, 15:29