Interpretation | Date | Rule | Summary |
30 | 28 Nov 19 | 20.23 | Batten connection to different sail skins |
29 | |||
28 Oct 19 | 15.7 | Length of foil flap | |
27 | 25 Sep 19 | 11.8 | Enclosed watertight volume |
26 | 15 Sep 19 | 11.7 | Surfaces that can support the crew |
25 | 24 Sep 19 | 12.6 | Foil arm drum |
24 | 19 Aug 19 | 15.2 | Foil Flaps |
23 | 25 Sep 19 | 13 / 15 | Foil arm fairing / Foil wing / rondure |
22 | 25 Sep 19 | 22.5 / 22.6 | Hydraulic actuators |
21 | 16 Jun 19 | 8.5 / 9.1 | GRS and Matt Semi-Gloss paint request |
20 | 16 Jun 19 | 8.5 / 9.1 | Awlgrip paint request |
30 Jul 19 | 10.1 | Box in cockpit | |
18 | 31 May 19 | 26.2 | CIS. |
17 | 31 May 19 | 21.3 | Ram and rope control system |
31 May 19 | 21.3 | Using feedback from the yacht state. | |
15 | 07 Apr 19 | 21.3 | Refers to Interp 11. |
25 Feb 19 | 11.14 | Water retention | |
07 Feb 19 | 10.1 | Headsail hard cover. | |
12 | 04 Feb 19 | 20.4 | Refers to Interp 8 - Openings. |
11 | 14 Feb 19 | 21.3 | Control system functions on hydraulic rams. |
10 | 03 Jan 19 | 31.12 | Measurement authority and measurement certificate. |
9 | 03 Jan 19 | 22.5 / 22.6 | Hydraulic actuators. |
8 | 11 Jan 19 | 20.4 | Mast bulkheads and openings in the mast bulkheads. |
7 | 01 Dec 18 | 20.6 | Dock tune condition of a mast. |
6 | 22 Nov 18 | 7.2 / 8.7 | Construction limits and uncontrolled components. |
5 | 19 Dec 18 | 12.11 | Crew being covered by any part of the yacht. |
4 | 25 Oct 18 | 7.7 | Mould plug. |
3 | 03 Jan 19 | 11.19 | Paint and calculating the the areal density of the hull shell. |
2 | 19 Oct 18 | 21.3 | Control system functions on code zero cable. |
1 | 16 Oct 18 | 35.64 | Linear component. |